top of page
Search
  • frances-higgins

Substation Requirements (Crystal Rig - SPEN)

Updated: Oct 13, 2020

Frances-Higgins Projects are working closely with a well known HV Contractor within the UK Substation Industry. Due to an increased workload in Scotland they require several contractors to join the team.


We are looking to speak to the below crafts available to start work within the next two weeks:


  • HV Wiremen

  • Mechanical Fitters

All positions are within the live substation so you must have a minimum of WI1 Authorisation


This work will continue till at least March 2021.


For more information, please contact Jess Peacock via email: Jess@frances-higgins.co.uk to arrange a call back.


575 views0 comments

Comments

Couldn’t Load Comments
It looks like there was a technical problem. Try reconnecting or refreshing the page.
bottom of page